2007年5月翻译资格考试三级英语笔译实务真题
VIP免费
3.0
2024-11-17
1
0
33.5KB
3 页
3.8金币
侵权投诉
2007 年 5 月翻译资格考试三级英语笔译实务真题
Section 1: English-Chinese Translation (50 points)
It took nine years from the time the Danish and Swedish governments agreed to
build a fixed link between their countries to the time the first car, train,
truck and bicyclists crossed the Oresund Bridge.
Construction of the bridge, including design and cornerstone, began in March
1991 and was completed in July 2000. Today, it is the longest stone-stayed road
and rail bridge in the world. At approximately 10 miles (16 kilometers),
including the tunnel, it is an engineering and architectural marvel. But as
time has proven, the bridge is a cultural and economic boon as well. The sleek
span of concrete whose design typifies Scandinavian minimalism has contributed
greatly to the development of the Oresund region: the eastern part of Denmark,
including Copenhagen, and the southwestern part of Sweden, including Malmö and
Lund.
The level of commuting between Malmö and Copenhagen has quadrupled since the
opening of the bridge in 2000, and the number of Danes moving to the south of
Sweden has increased sixfold. The Oresund region has become a cultural and
economic powerhouse, considered a model region by the European Union.
Work on the bridge began in 1995, and was undertaken by a team of international
consulting and construction companies.
From the beginning, construction of the bridge complied with some of the
world’s toughest environmental regulations, as well as many advanced design
and construction details. The Mexico-based CEMEX, one of the world’s largest
producers of Cement and ready-mix concrete, was awarded a contract to deliver
tons of high-quality cement to help build the main part of the bridge, the two
approach bridges and the tunnel.
When it opened in July 2000, the Oresund Bridge consisted of a 3.5-kilometer
immersed tunnel, the largest of its kind in the world, a 4-kilometer long
artificial island (made from mud dug out from the bottom of strait to make
space for the tunnel) and a 7.8-kilometer cable-stayed bridge, the world’s
longest bridge including both a highway and a railroad.
Though just half of the total construction, the actual bridge span, is visible
above water, the overall architecture was designed to please the eye from both
the Danish and Swedish sides of the strait.
相关推荐
-
VIP免费2024-11-09 41
-
VIP免费2024-11-09 84
-
VIP免费2024-11-10 51
-
VIP免费2024-11-10 427
-
VIP免费2024-11-12 43
-
VIP免费2024-11-14 17
-
2024-12-24 8
-
2025-01-04 5
-
2025-01-04 6
-
2025-01-04 8
分类:行业题库
价格:3.8金币
属性:3 页
大小:33.5KB
格式:DOC
时间:2024-11-17
相关内容
-
2020年贵州铜仁中考地理真题及答案
分类:行业题库
时间:2025-01-04
标签:无
格式:DOC
价格:3.3 金币
-
2020年贵州铜仁中考化学真题及答案
分类:行业题库
时间:2025-01-04
标签:无
格式:DOC
价格:3.3 金币
-
2020年贵州铜仁中考历史真题及答案
分类:行业题库
时间:2025-01-04
标签:无
格式:DOC
价格:3.3 金币
-
2020年贵州铜仁中考生物真题及答案
分类:行业题库
时间:2025-01-04
标签:无
格式:DOC
价格:3.3 金币
-
2020年贵州铜仁中考数学真题及答案
分类:行业题库
时间:2025-01-04
标签:无
格式:DOC
价格:3.3 金币